
A project record should let you resume work without guessing which hook you used or whether the last row was finished. Use the form below as a notebook, not as a substitute for your pattern. It keeps observations, estimates and next actions together.
Start with the decision, not every possible detail
Write whether a dimension is a target or a strict maximum. “Around 100 × 140 cm” allows a different decision from “must be no wider than 100 cm”. Record the predicted size after rounding as well as the target, so a whole-stitch or whole-square choice remains visible.
Keep two sample records separate
Gauge uses the counted stitches and rows over their measured window. A yarn estimate uses the mass and complete area of the piece weighed. Copy both records only when you have measured them; do not fill a missing sample mass with the weight of the original ball. See the illustrated measuring guide if those two areas are unclear.
Make your own project record
Fill only what you know. Blank entries are exported as “Not recorded”; they are not treated as completed checks. Keep the designer's full instructions alongside this note.
Read a completed planning example
This example is calculated for teaching, not a physically tested pattern. It describes a plain rectangular fabric only. Its working counts do not specify foundation or turning chains.
| Record | Example entry |
|---|---|
| Gauge | 18 stitches and 12 rows in a central 10 × 10 cm window after care. |
| Working counts | 54 stitches × 48 rows; repeat 1, extra stitches 0. Setup follows the chosen pattern. |
| Quantity sample | Complete 15 × 15 cm piece weighs 13.5 g. |
| Main fabric estimate | 1,200 ÷ 225 × 13.5 = 72 g. With a chosen 15% margin: 82.8 g. |
| Label and purchase | 100 g / 200 m: one ball. Estimated consumption with margin is 165.6 m; purchased length is 200 m. |
| Unrecorded details | Product, actual hook and care method still need to come from a real sample. |
Load the working-count example ↗. If you change the stitch, make a fresh sample instead of reusing this exercise's density.
Treat the allowance as a named assumption
“15% extra” should have a reason in the record. It does not prove that a border, a different colour and future repairs all fit inside the same allowance. Keep substantial joins and borders as separate components using the component walkthrough.
Record a measurement that could change the plan
Choose an early checkpoint, such as a joined pair or a short section of rows. Write an expected observation before checking: “width near 30 cm without pulling”. If the measured width is 33 cm, return to the counts and sample before making the remaining length. Do not overwrite the original expectation; keep both numbers so you can see what changed.
Leave the next action unambiguous
“Row 24 complete; next is row 25 in B” is more useful than “row 24”. Add the side facing, hook and last count if they will help you resume. When the work and note disagree, count the piece before continuing.
A five-minute restart check
- Match the hook and yarn to the note.
- Find the last completed row or round in the work and original pattern.
- Check the count at that point; a saved note is not proof the count is correct.
- Read the next full instruction, including turns and colour changes.
- Update the next-action field after the session and download a new copy.
The download is a snapshot of your current answers. Reopening this web page does not restore it. Keep the text file with your pattern or copy it into your own notebook.